Water treatment plant
Challenge for the customer
Integrate a second production line or alternatively install another process water system for the second line.
The task was to integrate a second production line or, alternatively, to install another process water system for the second line.
After detailed consultation and design, the experts from EnviroFALK recommended a water treatment system that supplies both production lines.
- Reduced operating costs
- High production output
- Sustainable water management
The new generation of EnviroFALK process water technology enables high production output with reduced operating costs.